Service

Mobile home site prep

Mobile and manufactured home site prep has its own set of requirements — a level, properly compacted pad sized to the home's footprint, utility connections run to the right locations, and driveway access sized for delivery.

Services  /  Mobile home site prep

What's included

  • Clearing and grading a level pad at the correct elevation and dimensions for the home
  • Compaction to the specification manufactured home foundations require
  • Utility trenching for water, sewer/septic, and electrical to the connection points the home requires
  • Driveway or access road grading sized for the home's delivery and setup

What's different about this kind of site prep

Manufactured home foundations have specific pad and pier requirements set by the manufacturer and local code, which are often more particular about level tolerance than a standard site-built pad. We grade to those specs rather than a general "level enough" standard.

What affects cost

Lot size and existing condition, how much clearing is needed, distance and complexity of utility runs, and whether the access road needs to be built or improved for a home delivery truck.

Recent work

Service areas

Available across the Greater Chattanooga area.

FAQs

Common questions, straight answers.

Do you handle the utility hookups themselves?

We trench and run the lines to the connection points; final hookup to the home is typically done by the utility or a licensed trade once the home is set.

What if the access road isn't wide enough for a delivery truck?

We can grade and build out access to the width and turning radius a home delivery requires — flag this early so it's part of the initial scope.

Do manufactured homes need a different pad than a site-built house?

Often, yes — manufacturer specs and local code frequently have specific pad and pier requirements that differ from a standard foundation. We grade to those specs.

Ready to break ground?

Let's talk about your site.

Request an estimate Free walk-through. · Written estimate. · No pressure.